Commercial Heating

Commercial Plant Room Installation

Design and installation of a new commercial plant room with twin Hamworthy boilers configured to share the heating load.

The client required a modern, efficient heating solution for their commercial building. The existing system was no longer fit for purpose, and a full redesign was needed to meet the demands of the building reliably and efficiently.

The Brief

A commercial customer needed a new heating system designed and installed from scratch — including a dedicated plant room to house the equipment properly and a specification suited to the scale and demands of the building.

Our Solution

Trevara designed and installed a complete new plant room, specifying twin Hamworthy commercial boilers configured to share the heating demand. The twin-boiler arrangement provides built-in redundancy and allows the system to modulate efficiently — one boiler handles the base load while the second fires when demand increases.

  • Full plant room design and installation
  • Supply and installation of 2x Hamworthy commercial boilers
  • Twin-boiler configuration for shared load and redundancy
  • All associated pipework, controls, and safety devices
  • Full commissioning and documentation

The Result

The new plant room delivers a reliable, efficient commercial heating system with improved control and built-in resilience. The twin Hamworthy boiler configuration ensures the building maintains consistent heating performance, with the capacity to continue operating on a single boiler in the event of maintenance or failure.

Commercial Plant Room Installation — image 1
Commercial Plant Room Installation — image 2
Client Anon
Location Anon
Service Commercial Heating
Year Anon

Ready to start your project?

Trevara provides professional plumbing services across Sandhurst and surrounding areas. Get in touch for a free, no-obligation quote.